You have been appointed as an Assistant tender’s department manager for a consultation development firm. The company has recently taken a different
Student Name/ID Number/Section |
|
HTU Course Number and Title |
50400252 Tendering and procurement |
BTEC Unit Number and Title |
12- Tender and procurement |
Academic Year |
2024-2025 |
Assignment Title |
Assignment 1 : Tender preparation and requirements for design project |
Assignment Ref No |
1/M/618/8091 |
Issue Date |
the Assignment Brief was discussed with the student orally on 22/10/2024 and submitted on 24/11/2024 |
Formative Assessment dates |
29/12/2024 & 05/1/2025 Assignment 1- Part 1 oral formative feedback. 19/1/2025 Assignment 1- part 2 submission Oral Presentation and formative feedback |
Submission Date |
29-01-2025 – Summative Feedback |
Submission Format |
The submission is comprised of the following with Digital Copy:
|
Unit Learning Outcomes |
By the end of this unit, students will be able to: LO1 Define what constitutes a tender and the information required for this process. |
LO2 Explain the procedures and contractual arrangements for tendering. LO3 Analyse the factors that affect the selection of construction procurement methods. LO4 Calculate an estimate for a work activity. |
Assignment Brief and Guidance |
The Guidance: The aim of this unit is the process of procurement – obtaining the services of a main contractor to construct their project – is often complex. The selection of a contractor that will meet the client’s expectations is essential so that time, quality and cost constraints are met, with no delays, overruns or budgets exceeded. Tendering is the process of obtaining a price for the designed and specified works. The importance of contractor selection to the successful completion of a client’s project cannot be overstated. This unit aims to give students the knowledge they need to be able to select a procurement route and an appropriate tendering method in the awarding of a project to a main contractor. Students will learn how to prepare a tender package in procuring a contractor for a client’s work. Many different procurement methods are available to achieve this: from open to closed systems. The Scenario of Assignment I part I You have been appointed as an Assistant tender’s department manager for a consultation development firm. The company has recently taken a different project with different orientations. As part of the first meeting with the new client, you have been asked to select one of these project providing a presentation , the first presentation to cover all points related to required documents for preparing a tender documents for different types of projects and procurement method which will be followed by the client and contractor with all related items from BoQ and Specifications. The second part of the presentation to cover the Construction procurement methods and preparing the tender documents for their design project. In the presentation you should
|
privately funded project
Accordingly you can analyze to the client the different influences on procurement between public and private projects.
At the end of the presentation you can , evaluate the relationship between procurement route, contract type and tender process in limiting risk for client and contractor. |
Learning Outcomes and Assessment Criteria |
|||
Learning Outcome |
Pass |
Merit |
Distinction |
LO1 Define what constitutes a tender and the information required for this process |
P1 Explain the information required to be produced prior to tendering. P2 Illustrate the documentation required to formulate a tender for a major project. |
M1 Compare the use of specifications and bills of quantities as tendering methods used for a privately funded project. |
D1 Analyze the potential benefits of Building Information Modelling (BIM) in the tender process |
LO2 Explain the procedures and contractual arrangements for tendering |
P3 Present the results of a taking- off procedure in producing a bill of quantities. P4 Describe the relationship between the type of tender and different taking-off techniques for a procurement strategy |
M2 Compare the use of specifications and bills of quantities as tendering methods used for a privately funded project. |
D2 Evaluate the relationship between taking-off techniques and the type of contractual arrangements for a project |
LO3 Analyse the factors that affect the selection of construction procurement methods |
P5 Explore the professional, legal and industry issues that influence procurement. P6 Explain the factors that determine the selection of an estimating technique |
M3 Analyse the different influences on procurement between public and private projects. |
LO3 and LO4 D3 As Evaluate the relationship between procurement route, contract type and tender process in limiting risk for client and contractor. sess the effect of a given estimating technique on the selection of a |
LO4 Prepare tender documentation for a given project |
P7 Compile project parameters, to inform tender documentation, for a given project. P8 Produce tender documentation (based on drawings and specifications provided by others) for a given project. |